The national development and Reform Commission: the implementation time of the industrial restructuring and revitalization plan is considered to be 3 years. Editor's note: Liu Tienan, deputy director of the national development and Reform Commission, said on the 27th that the implementation time of the key industrial revitalization plan is considered to be three years (years)
China February 27 The State Information Office held a press conference on the morning of February 27, inviting Liu Tienan, deputy director of the national development and Reform Commission, Chen Bin, director of the industrial coordination department, and Zhu Hongren, director of the operation monitoring and Coordination Bureau of the Ministry of industry and information technology, to introduce the relevant situation of the adjustment and revitalization plan of key industries
it is reported that while coping with the impact of the international financial crisis and focusing on solving the current outstanding problems, accelerating structural adjustment, strengthening the momentum for development and realizing industrial upgrading are the main lines of formulating and implementing the revitalization plan of ten key industries. Therefore, the revitalization plan is different from the previous special plans and medium and long-term plans in terms of form and specific technical standards for building structure testing gb/t50344 (2) 004
the national development and Reform Commission said that the revitalization plan for key industries is neither a simple measure to deal with the crisis, nor an all inclusive long-term plan. It should be a combination of near and far, and address both the symptoms and root causes. It should not only be based on the current stable development, but also seize the opportunity to promote structural adjustment, which is conducive to the continued growth goals, priorities and grasp of high-performance composites in the fields of aerospace and national defense utilization, Action plan for practical results hydraulic universal testing machine mainly adopts the scheme of high-pressure hydraulic source as the power source. The implementation time is considered as three years (years)
LINK
Copyright © 2011 JIN SHI